Tuesday, November 3, 2026

Where every project stands

Five projects, one page. Each one shows how far along it is, the single next step, and whether anything needs you.

A few decisions are waiting on you

Five things need a word from you before the work can move:

  • Crewora — the Stripe test code needs a Stripe sign-in, later today (see its card).
  • Luma Funding — a few details for the NinjaTrader inquiry and the mailbox.
  • SI-Trader — chart templates still to come.
  • THAAI — one call on the group limit, and paste the OpenAI key through the secure link (see its card).
  • Vequro — your say-so for the CI diagnosis step: any workflow-file change or new code push to find the test that does not finish needs your explicit approval for that exact step.

All 5 at a glance

3 live — Crewora, SI-Trader, THAAI 1 testing — Luma Funding 1 being fixed — Vequro

Working order: one project moves at a time, in the order below — closest to earning first. The rest wait their turn.

Crewora

Live · almost ready for beta

The app is live and working. Roadmap Steps 1, 2, 4, 5 and 8 are done with evidence — the real AI test passed on Nov 2, and the pricing you picked (Pricing A) has been deployed. The live Stripe self-test is now the path: you will test live Stripe yourself later today with your own card, using a 90%-off, single-use discount code for the $9 credit pack only, so you pay $0.90 — a real payment that can then be refunded as proof. The checkout fix for that test is done and deployed (Nov 3, 08:20 EST): credit-pack checkout now accepts discount codes, and the credit-grant check accepts a discounted payment only when Stripe's discount amount exactly matches the price minus what was paid, so a discounted payment still grants the pack correctly. The discount code itself is not created yet: creating it through the Stripe connection was refused (write permission), and read-backs confirm no coupon or code exists yet. Also on Nov 3 (around 08:30 EST), the Step 7 workspace-setup gate (1A-3) was proven: a prepared staging account that had never set up a workspace first got a 404 "workspace not set up" response, and after making the same call the "Set up my workspace" button makes, it had exactly 1 workspace and 1 Free-50 credit account. That proof came from the API click-path plus served-code evidence — not from a browser-visual screenshot — and Step 7 as a whole is still not done: other gates and your own backup receipt are still missing. Step 9's phone-view and console checks were likewise checked by code and asset evidence only, not a real phone render or console capture, and Step 9 is still not done either — the support route and monitoring are still open.

app.crewora.net ↗
StartedBuiltLive — you are hereSelling
Next step Create the coupon and code in the Stripe Dashboard with those exact restricted settings (90% off, the $9 pack only, one use, 14-day expiry), then your $0.90 test purchase and the refund proof. Paid checkout stays closed to the public until that live purchase + refund proof passes.
Needs you Sign in to Stripe later today (as you planned) so the test code can be created in the Dashboard.

SI-Trader

Site live · checkout live

Verified Nov 3: si-trader.net is live at $569, one-time only — the Square checkout is live and the stray monthly option is gone. The locked delivery build is verified (licence lock present), and the Payhip product is live (Unlisted) with that same locked build.

si-trader.net ↗
StartedBuiltLive — you are hereSelling
Next step Delivery to Square buyers stays manual by email for now. Chart templates for NQ, MNQ, ES, MES and CL are still to come.
Needs you The chart templates — and the Square bank account step is yours.

Luma Funding

Testing only · pre-launch

The site is live at lumafunded.com with the approved prices exactly: $69 / $99 / $159 / $229 one-time, or $39 / $45 / $89 / $149 monthly — 90% split, $0 activation, $0 data fees. Overnight, the Test Lab replay checks passed 7 of 7 computable checks. Dashboard payments stay in test mode — no real money.

lumafunded.com ↗
StartedBuilt — testing nowLiveSelling
Next step The partner track waits on your items below — then you send the NinjaTrader inquiry yourself.
Needs you Entity type and signature name for the inquiry, the Zoho setup so support@lumafunded.com goes live — and one call: the site says 8 minis on the $50K plan but the dashboard starts at 5 lots. Which one is right?

Vequro

Base being fixed

Takeover Steps 1–4 are done at code level — the PIN gate and the recovered fixes are merged into the recovery baseline. You picked fix Option A; the fix is pushed as draft pull request #61. The latest check run (41656517879) on the newest fix head (2982c637) is now completed — cancelled at the full 60-minute cap. The check job ran 14:43:38–15:44:13 UTC: install passed, lint passed, then the security and automated QA step ran 59 minutes 32 seconds and was cancelled, and every later step — including proof transport — was skipped. That is not a code failure and not a pass — there is still no verdict on the fixes. All three check runs on pull request #61 have now been cancelled at exactly their job time caps (15, then 30, then 60 minutes), while the full local suite on the same fixed tree finished in about 29 minutes — so a hanging or extremely slow test in the CI environment is now the leading suspicion, rather than the time limit simply being too short.

StartedFixing the baseLiveSelling
Next step Diagnose which test or group does not finish in CI — not just raise the timeout again. If a complete run ever goes green, pull request #61 is marked ready and merged (founder tap), then the checks run again on the merged recovery branch (PR #53), then the second-account approving review, then the one-sitting staging pass.
Needs you Your say-so for the diagnosis step — any workflow-file change or new code push for diagnosis needs your explicit approval for that exact step.

THAAI

Live — porch landing and porch app now in production

The porch landing page went live at thaai.net on your tap, and the porch app was then promoted to production on your explicit go — the new app is live in production (version 87). Outside checks pass: the health check is unchanged (sign-ups on; public posts, video and outside AI still off), the login page serves the new app, and staging is untouched. The 12-point signed-in check was re-run and completed on Nov 3, 08:10–08:18 EST, with you awake and approving Google's sign-in prompts live (numbers 83, then 92): 11 of 12 points pass in production — identity and porch design, posting, commenting, likes, following, the friends view and a friend request sent, sharing and reposting with the members-only link note, a photo post, Calm Mode on and off, the Lumen Passport honesty wording (Lumen's helper stays off in production), and staying signed in with everything intact after signing out and back in. The one point that did not pass is group creation, refused with "Group limit reached (3 owned groups)" — that is a product limit, not a break, and nothing was deleted to force the test. The check left labeled test traces under your own account: a test post and comment, a photo post, a repost, a like, a follow, and a pending friend request. The real-Lumen chapter also started on Nov 3 on your go (around 08:26 EST), with OpenAI chosen as her brain. Lumen's own account is live as of 09:09 EST, verified in the database: she joined through the real email sign-up door, handle @lumen, display name Lumen, with you as her operator of record. The labeling code is prepared but not deployed yet — her profile still shows the HUMAN tag until that deploy — and no AI replies are live in production yet.

thaai.net ↗
StartedBuiltLive — you are hereSelling
Next step Paste the OpenAI key through the secure link sent at 08:26 EST — that is the last missing piece before the labeling deploy, Lumen's first supervised reply, and the reply loop. Also your call on groups — raise the owned-group limit or free a slot — so group creating and posting can be proven; then the founder acceptance pass.
Needs you Paste the OpenAI key via the secure link — and the group-limit call: raise the limit, or free one of your 3 owned groups.